Abstract
The subway station is composed of underground continuous wall,lining wall,bottom plate and top plate.The crack of roof and lining wall has always been a problem in design and construction.The induced joints of subway station structure can reduce disorder cracking induced by temperature stress of the concrete structure during the construction and operation of subway station structures.Based on Qingpu Station of Shanghai Metro Line 17,numerical analysis is conducted by finite element method.The factors for distance of induced joints,the thickness of the lining wall,the separation and integral pouring of the roof and lining wall are addressed.The results show that the stress of the lining wall and roof is reduced after induced joints are put in place.With the increase of the distance of induced joints,the stress of the lining wall and roof decreases gradually.Meanwhile,the stress of the lining wall and roof decreases gradually with the increase of lining wall thickness.When the top lining wall and roof are poured separately,the stress of the top lining wall and roof is larger than that of the integrated casting.The results may provide optimization measures and suggestions for setting induced joints to prevent cracks in the subway station.关键词
地铁车站/诱导缝/数值分析/裂缝/优化设置Key words
Subway station/Induced joint/Numerical analysis/Crack/optimization setting分类
交通工程引用本文复制引用
郭智刚,程道来,董文澎,潘伟强,刘沛..地铁车站诱导缝设置参数分析[J].铁道标准设计,2018,62(7):135-139,5.基金项目
国家重点基础研究发展计划(973 计划)项目子课题(2013CB036300) (973 计划)
上海市高校青年教师培养资助项目(ZZyy15111) (ZZyy15111)
上海隧道工程有限公司科研项目(2015-SK-08) (2015-SK-08)
上海市科委地方院校能力建设项目(17090503500) (17090503500)
上海应用技术大学校内协同创新基金项目(XTCX2017-24) (XTCX2017-24)