工程研究-跨学科视野中的工程2018,Vol.10Issue(3):247-255,9.DOI:10.3724/SP.J.1224.2018.00247
建设工程公众参与制度安排研究——以上海磁悬浮为案例
Study on Institutional Arrangements of Public Participation of Construction Project: A Case Study of Shanghai Magnetic Levitation Construction Project
吴陆锋 1贾广社1
作者信息
- 1. 同济大学经济与管理学院,上海 200092
- 折叠
摘要
Abstract
The lack of public participation will cause engineering social issues, but the lack of institutional arrangements is the root cause. From the three aspects of the formal institutional arrangements, the informal insti-tutional arrangements and the institutional enforcement, this paper analyzes the shortages of institutional arrange-ment of public participation in the construction project, and takes the Shanghai maglev as a study case to make an empirical analysis, and points out the flaws of institutional arrangement and institutional change in public partici-pation. In order to improve the quality of public participation in the construction project, it is essential to reach the virtuous path dependence, perfect the formal institutional arrangement, value the informal institutional arrange-ment and secure the institutional enforcement.关键词
公众参与/制度安排/制度变迁/工程社会问题Key words
public participation/institutional arrangements/institutional change/engineering social issues分类
管理科学引用本文复制引用
吴陆锋,贾广社..建设工程公众参与制度安排研究——以上海磁悬浮为案例[J].工程研究-跨学科视野中的工程,2018,10(3):247-255,9.