路基工程Issue(3):73-78,6.DOI:10.13379/j.issn.1003-8825.2018.03.15
上软下硬地层单拱大跨地铁车站施工工法优化分析
Optimization Analysis on Construction Methods of Single Arch and Large Span Subway Station in Upper-soft and Lower-hard Ground
摘要
Abstract
In order to adapt to the upper-soft and lower-hard ground and has economic benefits on the basis of construction safety, the arch cover method has been invented based on the PBA construction method by the tunnel workers. In this paper, based on the Guiyang metro line 2 Yangmingci subway station, with the threedimensional finite difference numerical simulation, the construction method of Yangmingci subway station has been analyzed and optimized based on the geological conditions and surrounding construction environment, considering the construction safety and time of construction and comprehensively comparing different working conditions. The basic idea of arch cover method has been discussed deeply and that the arch cover method should be applied to the special construction environment of the engineering area has been put forward.关键词
上软下硬/地铁车站/拱盖法/工法优化/数值模拟Key words
upper-soft and lower-hard ground/subway station/arch cover method/optimization of construction methods/numerical simulation分类
交通工程引用本文复制引用
王圣涛,张俊儒..上软下硬地层单拱大跨地铁车站施工工法优化分析[J].路基工程,2018,(3):73-78,6.基金项目
国家自然科学基金资助项目(51378435) (51378435)