组合台车在明挖地铁车站施工中的应用
Application of Combination Trolley in Construction of Open Excavation Subway Station
黎浩昀1
作者信息
- 1. 中铁二局第四工程有限公司,成都 610300
- 折叠
摘要
Abstract
In this paper, in view of the main body structure construction quality control difficulties of Xiangjingling open excavation subway station of Guangzhou subway 13 line, the large steel formwork is studied to be adopted and the formwork system, support, operation platform, walking system and construction technology and operation key points are illustrated. Through construction verification, the large steel formwork combination trolley is increasing the construction efficiency and guaranteeing the construction quality of main structure in the construction of open excavation subway station structure.关键词
明挖基坑/地铁车站/大型钢模板组合台车/施工技术Key words
open excavation foundation pit/subway station/large steel formwork combination trolley/construction technology分类