路基工程Issue(3):214-218,5.DOI:10.13379/j.issn.1003-8825.2018.03.45
成都地铁1号线盾构区间穿越停车场出入线施工技术研究
Study on Construction Technology of Chengdu Metro Line 1 Shield Interval passing through Parking Lot Access Line
林强1
作者信息
- 1. 中铁二局工程有限公司城通分公司,成都 610000
- 折叠
摘要
Abstract
Because buildings are dense in cities, the development and utilization of urban underground space will inevitably have an impact on the projects already built on the ground, so that the surrounding environment of the already-built projects will be changed and even unpredictable risks may even occur. With the first phase of Phase III of Chengdu Metro Line 1 passing through Dongsi parking lot access line as an example, some beneficial attempts were made in this paper from the aspects of reinforcement measures at early stage, construction control measures and construction monitoring measures. Also, a set of construction technology of metro shield interval passing through the parking lot access line was formed and it was verified during the construction that the cumulative settlement displacement is within the safe range of displacement.关键词
盾构隧道/卵石地层/下穿停车场/施工措施/掘进参数Key words
shield tunnel/sandy cobble stratum/undercrossing the parking lot/construction measures/driving parameters分类
交通工程引用本文复制引用
林强..成都地铁1号线盾构区间穿越停车场出入线施工技术研究[J].路基工程,2018,(3):214-218,5.