煤矿安全2018,Vol.49Issue(4):132-135,4.DOI:10.13347/j.cnki.mkaq.2018.04.035
脆性围岩炮采工作面沿空留巷技术实践
Practice of Gob-side Entry Retaining Technology in Blasting Face with Brittle Surrounding Rock
赵雨 1冯光明 2张赛赛1
作者信息
- 1. 中国矿业大学 矿业工程学院,江苏 徐州 221116
- 2. 中国矿业大学 煤炭资源与安全开采国家重点实验室,江苏 徐州 221116
- 折叠
摘要
Abstract
There are a certain technical limitations for the technology of gob-side entry retaining under brittle surrounding rock conditions. Taking Xinzhuang Mine as the engineering background, we studied the stability control of brittle retaining entry and designed the process of roadside filling system and the parameters of roadside filling body, and then we gave a depth analysis on surface & deep surrounding-rock along gob-side entry by a scientific mine pressure observation program. The result shows that:under the brittle surrounding rock and seriously coal wall caving conditions, the technical support system for reinforcement of brittle rock has a good effect on controlling the deformation of the surrounding rock. Moreover, the new high-water material has the characteristics of rapid setting and strong anti-deformation ability that can adapt well to the gob-side entry retaining under brittle surrounding rock.关键词
脆性围岩/沿空留巷/新型高水材料/加强支护/巷旁充填Key words
brittle surrounding rock/gob-side entry retaining/new high-water-filling material/reinforced support/roadside filling分类
矿业与冶金引用本文复制引用
赵雨,冯光明,张赛赛..脆性围岩炮采工作面沿空留巷技术实践[J].煤矿安全,2018,49(4):132-135,4.