山东煤炭科技Issue(4):36-37,2.DOI:10.3969/j.issn.1005-2801.2018.04.016
人工假顶在掘进巷道过断层带中应用分析
The Analysis of the Application of Artificial False Roof in Overcrossing the Fault Zone of Tunneling Roadway
吴三龙1
作者信息
- 1. 大同煤矿集团云冈矿,山西 大同 037000
- 折叠
摘要
Abstract
In the process of excavation, the roadway is likely to meet with fault structural belt, in which the roof will be broken and partial roof caving will arise, thus increases the difficulty of roof support, reduces the drivage efficiency. If reasonable effective measures are not taken in time to control the roof, it is easy to cause large area roof caving accident. To solve this technical problem, Yungang mine, in its construction of 311 belt of 12 # layer311 panel, first analyzed the roof support of the 311 belt lane overcrossing the F8 fault fracture zone, then decided to adopt artificial methods to control and broken roof, which can ensure that the stability and safety of broken roof.关键词
假顶/掘进/应用Key words
artificial false roof/tunneling/application分类
矿业与冶金引用本文复制引用
吴三龙..人工假顶在掘进巷道过断层带中应用分析[J].山东煤炭科技,2018,(4):36-37,2.