全断面一次爆破成型技术研究

秦辉

山东煤炭科技Issue(4):40-41,2.
山东煤炭科技Issue(4):40-41,2.DOI:10.3969/j.issn.1005-2801.2018.04.018

全断面一次爆破成型技术研究

Research on Full Section Technology of Roadway Based on Single Blasting

秦辉1

作者信息

  • 1. 山西阳煤集团新景矿煤业有限公司,山西 阳泉 045000
  • 折叠

摘要

Abstract

Because of the shortcomings of the sub blasting in the roadway driving process, so Xingjing Coal Mine put forward a blasting technology when it is heading for the rock roadway in the extended roadway of the North Lane. Through the analysis and comparison of the experimental results, it shows that the technology of the full section blasting technology is more economical and practical than the sub blasting technology.

关键词

全断面/爆破技术

Key words

full section/blasting technology