山东煤炭科技Issue(4):119-121,3.DOI:10.3969/j.issn.1005-2801.2018.04.049
徐庄煤矿16、17煤层底板充水因素分析研究
Analysis and Study on the Factors of Water Filling of Floor of 16 and 17 Coal Seam in Xuzhuang Coal Mine
汪继学 1尹俊凯 1张承斌1
作者信息
- 1. 山东泰山地质勘查公司,山东 泰安 271000
- 折叠
摘要
Abstract
To further obtain the hydrogeological parameters and the water level changes of twelve ash, 14 grey, ordovician limestone karst in recent years, to guide the exploit in working face of the 16, 17 coal seam, in this paper we calculate the exploitation of 16, 17 coal floor water filling factors, by means of single-hole water test, connected to water test and aquifer water quality testing and other technical means to obtain the experiment data.关键词
水文地质/放水试验/底板充水因素Key words
hydrogeology/water release test/water filling factor of bottom plate分类
矿业与冶金引用本文复制引用
汪继学,尹俊凯,张承斌..徐庄煤矿16、17煤层底板充水因素分析研究[J].山东煤炭科技,2018,(4):119-121,3.