| 注册
首页|期刊导航|山东煤炭科技|矿井供电系统的防越级跳闸技术探讨

矿井供电系统的防越级跳闸技术探讨

李志庆

山东煤炭科技Issue(4):149-150,153,3.
山东煤炭科技Issue(4):149-150,153,3.DOI:10.3969/j.issn.1005-2801.2018.04.061

矿井供电系统的防越级跳闸技术探讨

Discussion on the Technology of Anti-Overstep Tripping of Mine Power Supply System

李志庆1

作者信息

  • 1. 山西汾西矿业集团宜兴煤业,山西 孝义 032302
  • 折叠

摘要

Abstract

This paper mainly introduces the reasons for the overstep tripping of underground power distribution equipment, and analyzes the plan of preventing the overstep tripping in the underground of Yixing Coal Mine, underground network short ladder delay selectivity, high selective interlock limit break, selective microcomputer limit per hour speed to break over-current protection, are put forward, which makes preparation for late overstep tripping caused by short circuit in the underground distribution system.

关键词

供电系统/防越级跳闸/联锁限时

Key words

power supply system anti-overstep tripping interlock time limit

分类

矿业与冶金

引用本文复制引用

李志庆..矿井供电系统的防越级跳闸技术探讨[J].山东煤炭科技,2018,(4):149-150,153,3.

山东煤炭科技

1005-2801

访问量0
|
下载量0
段落导航相关论文