山东煤炭科技Issue(4):179-180,183,3.DOI:10.3969/j.issn.1005-2801.2018.04.073
司马矿1211运巷探放水设计及措施分析研究
Analysis of the Design and Measures of Water Drainage in 1211 Transport Lane of Sima Mine
贾宏伟1
作者信息
- 1. 潞安集团司马煤业公司,山西 长治 047105
- 折叠
摘要
Abstract
Coal mine exploration and drainage construction is an important technical work to avoid water disasters and ensure safe production in coal mines. For the roadway driving with water hazard threat, it is easy to occur major coal mine flood accidents if we do not take reasonable design and measures of water exploration. The Sima Mine exploration and release team in Lu'an Group, through technical research, adopted effective water exploration and measures to ensure the safe production of coal mine during the construction of 1211 lanes. The occurrence of water damage was avoided.关键词
巷道/探放水/设计/措施Key words
roadway/water exploration/design/measures分类
矿业与冶金引用本文复制引用
贾宏伟..司马矿1211运巷探放水设计及措施分析研究[J].山东煤炭科技,2018,(4):179-180,183,3.