转炉冶炼高磷高带渣量铁液脱磷工艺研究

孙立根 郝剑桥 朱立光 刘增勋 王硕明

铸造技术2018,Vol.39Issue(5):1018-1022,5.
铸造技术2018,Vol.39Issue(5):1018-1022,5.DOI:10.16410/j.issn1000-8365.2018.05.018

转炉冶炼高磷高带渣量铁液脱磷工艺研究

Process of Dephosphorization of Molten Iron with High Phosphorus and Slag in Converter Smelting

孙立根 1郝剑桥 2朱立光 1刘增勋 1王硕明2

作者信息

  • 1. 华北理工大学 冶金与能源学院,河北 唐山 063000
  • 2. 河北省高品质钢连铸工程技术研究中心,河北 唐山 063000
  • 折叠

摘要

Abstract

For one domestic steel plant, the molten iron was poured into converter directly. The molten iron was higher phosphorus content, and the amount of slag, and the dephosphorization effect was poor. Based on the study of dephosphorization and combined with the practice of double-slag process in other enterprises, the smelting process of converter with high phosphorus and high slag content was optimized. The results show that the time of the first deslaging is delayed 4 to 6 min, the first pour the slag and the temperature control in the 1 400~1 400 ℃ and 1 600~1 650 ℃, slag alkalinity is controlled at 2.0~2.5 and 2.5~3.0, the mass fraction of FeO in slag is controlled at 15%~20% and 20%~25%, Good dephosphorization effect is obtained. The dephosphorization rate of converter reaches 80%~95%, which is obviously higher than that of the original process.

关键词

转炉/铁液带渣/脱磷/双渣

Key words

convert/hot metal with slag/dephosphorization/double-slag process

分类

矿业与冶金

引用本文复制引用

孙立根,郝剑桥,朱立光,刘增勋,王硕明..转炉冶炼高磷高带渣量铁液脱磷工艺研究[J].铸造技术,2018,39(5):1018-1022,5.