| 注册
首页|期刊导航|自动化学报(英文版)|A Robust Reserve Scheduling Method Considering Asymmetrical Wind Power Distribution

A Robust Reserve Scheduling Method Considering Asymmetrical Wind Power Distribution

Guanzhong Wang Qiaoyan Bian Huanhai Xin Zhen Wang

自动化学报(英文版)2018,Vol.5Issue(5):961-967,7.
自动化学报(英文版)2018,Vol.5Issue(5):961-967,7.DOI:10.1109/JAS.2017.7510652

A Robust Reserve Scheduling Method Considering Asymmetrical Wind Power Distribution

A Robust Reserve Scheduling Method Considering Asymmetrical Wind Power Distribution

Guanzhong Wang 1Qiaoyan Bian 1Huanhai Xin 1Zhen Wang1

作者信息

  • 1. Department of the Electrical Engineering, Zhe-jiang University, Hangzhou 310027, China
  • 折叠

摘要

关键词

Power system/reserve scheduling/robust/wind power

Key words

Power system/reserve scheduling/robust/wind power

引用本文复制引用

Guanzhong Wang,Qiaoyan Bian,Huanhai Xin,Zhen Wang..A Robust Reserve Scheduling Method Considering Asymmetrical Wind Power Distribution[J].自动化学报(英文版),2018,5(5):961-967,7.

基金项目

This work was jointly supported by the National High Technology Research and Development Program of China (2015AA050202). (2015AA050202)

自动化学报(英文版)

OACSCDEI

2329-9266

访问量0
|
下载量0
段落导航相关论文