高压电器2018,Vol.54Issue(8):114-119,6.DOI:10.13296/j.1001-1609.hva.2018.08.018
±800 kV特高压直流锡盟站换流阀运行试验及特殊试验
Operational Test and Special Test of Converter Valves for ±800 kV UHVDC Project Ximeng Converter Station
黄熹东 1胡治龙 1周会高 1同聪维 1王奔 1张腾 1徐子萌 1张长春1
作者信息
- 1. 西安高压电器研究院有限责任公司,西安 710077
- 折叠
摘要
Abstract
Ximeng-Taizhou ±800 kV UHVDC transmission project is an important plan of action for the control of atmospheric pollution in our country, the converter station rated DC current is 6 250 A, the capacity of the project up to 10 billion watt, this is the first 10 million k W UHVDC transmission project in the world. In order to ensure the safety and reliability of the transmission system, the converter valves must be verified by operational type test before the converter valve is installed. XIHARI has completed thethyristor converter valves operational type test and additional special test by using the thyristor valve synthetic test circuit, simulated the various working conditions of thyristor converter valves under the actual operation, and verified the design reliability of the valve. The test data provided the design reference for the manufacturers and related technical personnel of the thyristor and converter valve.关键词
±800 kV/特高压直流输电/换流阀/运行试验/特殊试验Key words
±800 kV/UHVDC/converter valve/operational test/special test引用本文复制引用
黄熹东,胡治龙,周会高,同聪维,王奔,张腾,徐子萌,张长春..±800 kV特高压直流锡盟站换流阀运行试验及特殊试验[J].高压电器,2018,54(8):114-119,6.