| 注册
首页|期刊导航|现代交通学报(英文版)|Speed prediction models for car and sports utility vehicle at locations along four-lane median divided horizontal curves

Speed prediction models for car and sports utility vehicle at locations along four-lane median divided horizontal curves

Avijit Maji Ayush Tyagi

现代交通学报(英文版)2018,Vol.26Issue(4):278-284,7.
现代交通学报(英文版)2018,Vol.26Issue(4):278-284,7.

Speed prediction models for car and sports utility vehicle at locations along four-lane median divided horizontal curves

Speed prediction models for car and sports utility vehicle at locations along four-lane median divided horizontal curves

Avijit Maji 1Ayush Tyagi2

作者信息

  • 1. Department of Civil Engineering, Indian Institute of Technology Bombay, Mumbai, India
  • 2. RITES Ltd., Vashi, Navi Mumbai, India
  • 折叠

摘要

关键词

Vehicle speed prediction model/Four-lane median divided highway/Horizontal curve/Regression analysis/The 85th percentile speed

Key words

Vehicle speed prediction model/Four-lane median divided highway/Horizontal curve/Regression analysis/The 85th percentile speed

引用本文复制引用

Avijit Maji,Ayush Tyagi..Speed prediction models for car and sports utility vehicle at locations along four-lane median divided horizontal curves[J].现代交通学报(英文版),2018,26(4):278-284,7.

基金项目

The authors are thankful to Indian Institute of Technology Bombay for providing funding (Project code:13IRCCSG001), National Highways Authority of India (NHAI) for providing plan and profile, and Mumbai Nasik Expressway Limited (MNEL) for providing support in field data collection. (Project code:13IRCCSG001)

现代交通学报(英文版)

2662-4745

访问量0
|
下载量0
段落导航相关论文