水道港口2018,Vol.39Issue(z2):80-85,6.
沉管隧道整体式最终接头的地基刚度差异问题及处置措施
Solutions and problem of foundation stiffness difference of the integrated type closure joint of immersed tunnel of Hong Kong-Zhuhai-Macao Bridge
LIN Ming 1LIN Wei 1JI Hai 1LIU Ya-ping1
作者信息
摘要
关键词
沉管隧道/沉降/风险/基础/最终接头/港珠澳大桥分类
交通工程引用本文复制引用
LIN Ming,LIN Wei,JI Hai,LIU Ya-ping..沉管隧道整体式最终接头的地基刚度差异问题及处置措施[J].水道港口,2018,39(z2):80-85,6.