| 注册
首页|期刊导航|计算机与数字工程|考虑时滞影响的绞吸挖泥船产量预测

考虑时滞影响的绞吸挖泥船产量预测

陈秀静 倪福生 魏长赟 杨金宝

计算机与数字工程2019,Vol.47Issue(2):296-299,4.
计算机与数字工程2019,Vol.47Issue(2):296-299,4.DOI:10.3969/j.issn.1672-9722.2019.02.008

考虑时滞影响的绞吸挖泥船产量预测

Production Prediction of Cutter Suction Dredger in Consideration of Time Delay

陈秀静 1倪福生 2魏长赟 1杨金宝2

作者信息

  • 1. 疏浚技术教育部工程研究中心 常州 213022
  • 2. 河海大学机电工程学院 常州 213022
  • 折叠

摘要

Abstract

The prediction model of BP neural network with time delay is proposed in order to improve the prediction accuracy of cutter suction dredger(CSD). The problem of time delay and lag between slurry density and the degree of vacuum is intensively an?alyzed. The proposed model is built on the basis of the input factors of BP neural network model,i.e.,the current of the cutter head, the velocity of pipeline transportation,the degree of vacuum and the swing speed,and the output factor,i.e.,slurry density. The re?sults show that the method can well predict the dredger production and can be used to predict and evaluate the actual production of a CSD.

关键词

疏浚/绞吸挖泥船/时间滞后/BP神经网络/产量预测

Key words

dredge/cutter suction dredger/time delay/BP neural network/production prediction

分类

信息技术与安全科学

引用本文复制引用

陈秀静,倪福生,魏长赟,杨金宝..考虑时滞影响的绞吸挖泥船产量预测[J].计算机与数字工程,2019,47(2):296-299,4.

计算机与数字工程

OACSTPCD

1672-9722

访问量0
|
下载量0
段落导航相关论文