首页|期刊导航|哈尔滨工业大学学报(英文版)|A Fuzzy Logic-Based Method for Risk Assessment of Bridges during Construction
哈尔滨工业大学学报(英文版)2019,Vol.26Issue(1):1-10,10.DOI:10.11916/j.issn.1005⁃9113.18089
A Fuzzy Logic-Based Method for Risk Assessment of Bridges during Construction
A Fuzzy Logic-Based Method for Risk Assessment of Bridges during Construction
摘要
关键词
analytical hierarchy process/risk assessment/fuzzy logic/fuzzy consistent matrix/bridge constructionKey words
analytical hierarchy process/risk assessment/fuzzy logic/fuzzy consistent matrix/bridge construction分类
交通工程引用本文复制引用
Jin Cheng,Mingsai Xu,Zhengrong Chen..A Fuzzy Logic-Based Method for Risk Assessment of Bridges during Construction[J].哈尔滨工业大学学报(英文版),2019,26(1):1-10,10.基金项目
Sponsored by the Ministry of Science and Technology of China (Grant No.SLDRCE14-B-08). (Grant No.SLDRCE14-B-08)