Abstract

In view of the production practice and water gushing characteristics of open-pit mine over anticline, the mine designs flexible, large displacement and large lift drainage pumping station to adapt to the unbalance and abrupt nature of the water inrush in the open-pit mine, and empties the water of the flat plate head in the shortest time, which does not affect the normal propulsion and extension of the pit.

关键词

露天矿/过背斜/大排量/移动泵站/设计/排水泵站

Key words

open-pit mine/over anticline/large displacement/moving pump station/design/drainage pumping station