石油地球物理勘探2019,Vol.54Issue(2):390-397,前插5,9.DOI:10.13810/j.cnki.issn.1000-7210.2019.02.018
油田开发后期井间砂体识别
Cross-well sand-body identification in the oilfield development late stage
摘要
Abstract
After more than 50years of the exploration and development,Daqing Changyuan Oilfield is now in the stage of dense well pattern and single-bed production. The development geological task is to identify the connectivity of sand bodies and the narrow channel boundary between wells.Based on high-density 3Dseismic data and well development information,a sand body prediction model for typical Changyuan Block is established with integrated well-seismic data inversion.Single- channel boundary of composite sands and narrow channel sandbodies between wells are identified by the geologic statistics inversion.It is concluded that the integrated well-seismic data inversion synthesizes the advantages of vertical and lateral high density information, and it is suitable for cross-well sand body identification in the oilfield development late stage.关键词
大庆长垣油田/密井网/井震结合反演/井间砂体/开发后期Key words
seismic inversion/dense well pattern/integrated well-seismic data inversion/cross-well sand body/oilfield development late stage分类
天文与地球科学引用本文复制引用
徐立恒,马耀军,朱遂珲,王增存,李正喜,梁宇..油田开发后期井间砂体识别[J].石油地球物理勘探,2019,54(2):390-397,前插5,9.基金项目
本项研究受国家科技重大专项"大庆长垣特高含水油田提高采收率示范工程"(2016ZX05054)资助. (2016ZX05054)