| 注册
首页|期刊导航|铁道标准设计|基于数值模型应力提取的并线高铁沉降计算

基于数值模型应力提取的并线高铁沉降计算

宋绪国 郭帅杰 陈洪运

铁道标准设计2019,Vol.63Issue(3):1-7,7.
铁道标准设计2019,Vol.63Issue(3):1-7,7.DOI:10.13238/j.issn.1004-2954.201804090002

基于数值模型应力提取的并线高铁沉降计算

Settlement Calculation of Co-line High-speed Railway Based on Numerical Model of Additive Stress Extraction

宋绪国 1郭帅杰 2陈洪运1

作者信息

  • 1. 中国铁路设计集团有限公司, 天津 300251
  • 2. 城市轨道交通数字化建设与测评技术国家工程实验室, 天津 300251
  • 折叠

摘要

Abstract

In order to evaluate the co-line high-speed railway settlement, and avoid the uncertainty of numerical model parameters as well as the limit of theoretical model, a new method is proposed with the additive stress obtained by numerical model and the settlement obtained by layer-summation theory.In this study, factors which influence the additive stress distribution are analyzed in detail, and the general rule for numerical model establishment is suggested.The soil constitutive model, modulus, Poisson ratio, layered soil and so on can be ignored in the numerical simulation analysis, and the vertical and horizontal model boundary should be 1.5~2.0 times of the railway base width.As the groundwater level influences the additive stress distribution significantly, it is more reasonable to ignore generally the groundwater effect.For engineering verification, a high-speed railway station on Beijing-Shanghai line is chosen, and the additive settlement evaluation is conducted accordingly.The results show that the proposed method is effective practically and theoretically.

关键词

铁路路基/并线/沉降计算/数值模型/附加应力/高速铁路

Key words

Railway subgrade/Co-line/Settlement calculation/Numerical model/Additive stress/High-speed railway

分类

建筑与水利

引用本文复制引用

宋绪国,郭帅杰,陈洪运..基于数值模型应力提取的并线高铁沉降计算[J].铁道标准设计,2019,63(3):1-7,7.

基金项目

中国铁路设计集团科技研究开发计划项目 (721743) (721743)

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文