| 注册
首页|期刊导航|铁道标准设计|高速铁路CP0框架控制网GAMIT解算结果与IGS站的选取研究

高速铁路CP0框架控制网GAMIT解算结果与IGS站的选取研究

毕继鑫 田林亚 李国琴 郭英起

铁道标准设计2019,Vol.63Issue(3):34-37,4.
铁道标准设计2019,Vol.63Issue(3):34-37,4.DOI:10.13238/j.issn.1004-2954.201805070005

高速铁路CP0框架控制网GAMIT解算结果与IGS站的选取研究

Research on the Relationship between the Results of GAMIT Processing and the Selection of IGS Station in High-speed Railway CP0 Frame Control Network

毕继鑫 1田林亚 1李国琴 1郭英起2

作者信息

  • 1. 河海大学地球科学与工程学院, 南京 211100
  • 2. 黑龙江工程学院测绘工程学院, 哈尔滨 150050
  • 折叠

摘要

Abstract

Aiming at the problems in the selection of IGS standard stations for high-speed railway CP0 frame control network data processing and taking the CP0 frame control network of Yanjiang Intercity Railway as the research object, this paper discusses the effects of choosing the space and quantity distribution of IGS standard stations on the baseline solution of high-speed railway CP0 frame network.The results show that, for processing CP0 frame network, IGS standard stations must be selected to provide a reference framework when GAMIT software is used to process observational data.But it is not necessary to select the IGS station located in the southern hemisphere, and the selected IGS stations should be evenly distributed, and the number of them should be 4 to 5.

关键词

高速铁路/CP0框架网/基线解算/IGS基准站/GAMIT/空间分布

Key words

High-speed railway/CP0 frame network/Baseline solution/IGS standard station/GAMIT/Spatial distribution

分类

天文与地球科学

引用本文复制引用

毕继鑫,田林亚,李国琴,郭英起..高速铁路CP0框架控制网GAMIT解算结果与IGS站的选取研究[J].铁道标准设计,2019,63(3):34-37,4.

基金项目

江苏省研究生科研与实践创新计划项目 (KYCX18_0621) (KYCX18_0621)

中央高校基本科研业务费用专项资金资助 (2018B701X14) (2018B701X14)

江苏省地质矿产勘查局科研项目 (2016-KY-03) (2016-KY-03)

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文