首页|期刊导航|全球能源互联网(英文)|Analysis of basic conditions of the power grid interconnection among Xinjiang, Pakistan, and five Central Asian countries
全球能源互联网(英文)2019,Vol.2Issue(1):54-63,10.DOI:10.14171/j.2096-5117.gei.2019.01.007
Analysis of basic conditions of the power grid interconnection among Xinjiang, Pakistan, and five Central Asian countries
Analysis of basic conditions of the power grid interconnection among Xinjiang, Pakistan, and five Central Asian countries
摘要
关键词
Interconnected power grid/Renewable energy resources/Complementary features/Belt and RoadKey words
Interconnected power grid/Renewable energy resources/Complementary features/Belt and Road引用本文复制引用
Chunyi Huang,Chengmin Wang,Heng Li,Jing Luo,Weiqing Sun,Xizhou Du..Analysis of basic conditions of the power grid interconnection among Xinjiang, Pakistan, and five Central Asian countries[J].全球能源互联网(英文),2019,2(1):54-63,10.基金项目
This Work was Supported by the State Grid Scientific and Technological Project (Title:Research on the Development and Integration Mode of Renewable Energy in Xinjiang Power Grid under the Background of Multinational Interconnection,NY71-17-008). (Title:Research on the Development and Integration Mode of Renewable Energy in Xinjiang Power Grid under the Background of Multinational Interconnection,NY71-17-008)