煤矿安全2019,Vol.50Issue(7):181-186,6.DOI:10.13347/j.cnki.mkaq.2019.07.044
坪上煤业瓦斯抽采系统优化
Optimization of Gas Extraction System on Pingshang Coal Industry
摘要
Abstract
In view of the insufficient capacity of the drainage system of the coal seam and goaf in the surface gas pumping station of Pingshang Coal Mine, it is analyzed that the practical problems such as the excess velocity of pipeline and the insufficient negative pressure capacity at the end of the port in drainage system, system transformation and upgrading of high and low pressure systems have been carried out, such as replacing large diameter pipes and installing new pipe wells, etc. The drainage resistance of the mine has been greatly reduced, and the capacity of the drainage system has been greatly improved, under the premise of not updating the high power pumping pump.关键词
抽采系统/抽采能力/流速/抽放阻力/管道井Key words
extraction system/extraction capacity/velocity of flow/drainage resistance/pipeline shaft分类
矿业与冶金引用本文复制引用
李宏,刘明举,马金魁..坪上煤业瓦斯抽采系统优化[J].煤矿安全,2019,50(7):181-186,6.基金项目
国家自然科学基金资助项目(51774116,U1504403) (51774116,U1504403)
河南省高校基本科研业务费专项资金资助项目(NSFRF140103) (NSFRF140103)
河南理工大学博士基金资助项目(B2016-02) (B2016-02)