航天器工程2019,Vol.28Issue(4):101-108,8.DOI:10.3969/j.issn.1673—8748.2019.04.016
嫦娥四号着陆器有效载荷任务设计与验证
Payload Task Design and Verification of Chang’e—4 Lander
摘要
Abstract
After the landing of Chang’e—4 spacecraft on the moon,payloads need to establish the initial state.This process intersects the separation process of the lander and the rover,which challenges the design of the working program.This paper,from the point of Chang’e—4 payload subsystem and spacecraft system,optimized the content,sequence and timing of the payload detection task based on the constraints of lunar surface work,according to the task requirements of each payload of the lander.And then the in—situ detection of landing area is carried out accord—ing to the designed workflow.The rationality of task design and the correctness of technical status were verified.This paper provides reference for the joint working program design of pay—load and spacecraft system in subsequent exploration missions.关键词
嫦娥四号着陆器/有效载荷/科学探测/月球背面Key words
Chang’e—4 lander/payload/scientific exploration/farside of the moon分类
航空航天引用本文复制引用
徐海涛,薛长斌,刘鹏,杨眉,李飞,陈丽平,纪奕才,张珅毅..嫦娥四号着陆器有效载荷任务设计与验证[J].航天器工程,2019,28(4):101-108,8.基金项目
国家重大科技专项工程 ()