煤矿安全2019,Vol.50Issue(8):179-183,5.DOI:10.13347/j.cnki.mkaq.2019.08.043
彬长矿区综采工作面导水断裂带发育规律
Overburden Failure Development Law in Fully Mechanized Mining in Binchang Mining Area
邢延团1
作者信息
- 1. 陕西长武亭南煤业有限责任公司,陕西 咸阳 713602
- 折叠
摘要
Abstract
Aiming at the problem that the Jurassic coal seam mining in Binchang Mining Area is seriously affected by the water damage of Luohe Formation aquifer, and the overburden failure development law of the fully mechanized mining is not clear. The 204 working face in Tingnan Coal Mine is taken as the research object, using the observation of consumption of flushing liquid, simple hydrological observation, and comprehensive exploration of drilling color TV peeping, the overburden failure development law of coal seam mining in fully mechanized mining face is studied. Combined with the domestic empirical formula for the development of the water-conducting fracture zone of the coal seam roof in the fully mechanized mining face, the method for determining the development height of the overburden failure zone suitable for the fully mechanized mining face in Binchang Mining Area is revised.关键词
彬长矿区/综采工作面/导水断裂带/顶板水害防治/冲洗液流失量Key words
Binchang Mining Area/fully mechanized coal face/water flowing fractured zone/roof water damage prevention/loss of flushing fluid分类
矿业与冶金引用本文复制引用
邢延团..彬长矿区综采工作面导水断裂带发育规律[J].煤矿安全,2019,50(8):179-183,5.