全长锚固技术在准备巷道中的应用

邵德盛 查德求 赵磊 王威 王福海 陈康 王庆牛

煤矿安全2019,Vol.50Issue(9):84-87,91,5.
煤矿安全2019,Vol.50Issue(9):84-87,91,5.DOI:10.13347/j.cnki.mkaq.2019.09.021

全长锚固技术在准备巷道中的应用

Application of Full-length Anchorage Technology in Prepared Roadway

邵德盛 1查德求 2赵磊 1王威 1王福海 1陈康 1王庆牛1

作者信息

  • 1. 安徽省煤炭科学研究院,安徽 合肥 230001
  • 2. 淮浙煤电有限责任公司 顾北煤矿,安徽 淮南 232150
  • 折叠

摘要

Abstract

In view of the geological conditions of the composite roof of the return air roadway in southen wing of Gubei Coal Mine, in order to ensure the support safety of the prepared roadway in the whole service life of the mining area, the rational bolt support parameters of the preparation roadway in group A coal of Gubei Coal Mine are determined by the "four-in-one"research means of theoretical analysis, analogy simulation, numerical simulation and on-site monitoring, and the technical scheme of full-length bolting and prestressing is proposed. Industrial tests have been carried out and the roadway has been running smoothly and safely. The 12-month observation of rock pressure shows that the maximum displacement of roof and floor is 140 mm, the displacement of both sides is 80 mm, and the deformation of roadway is small.

关键词

全长锚固/准备巷道/四位一体/联合支护/数值模拟

Key words

full-length anchorage/preparation roadways/quaternity/combined support/numerical modeling