Real time thermal field analysis on Wudongde super high arch dam during construction
Real time thermal field analysis on Wudongde super high arch dam during construction
摘要
关键词
2D thermal field/Restructuring method/Distributed optical fiber/Kriging/Concrete dam.Key words
2D thermal field/Restructuring method/Distributed optical fiber/Kriging/Concrete dam.引用本文复制引用
Haoyang Peng,Peng Lin,Ning Yang,Ming Li,Yu Qiao..Real time thermal field analysis on Wudongde super high arch dam during construction[J].全球能源互联网(英文),2019,2(3):264-269,6.基金项目
This work was supported by National Basic Research Program of China (973 Program) Grant No. 2011CB013503 and China Three Gorges Corporation research project (Contract number: WDD/0490). (973 Program)