全球能源互联网(英文)2019,Vol.2Issue(4):328-335,8.DOI:10.14171/j.2096-5117.gei.2019.04.005
Scheduling and control co-design for Networked Wind Energy Conversion Systems
Scheduling and control co-design for Networked Wind Energy Conversion Systems
摘要
关键词
Wind Energy Conversion System (WECS)/Networked Control System (NCS)/Time-delay/Deadband/Package-dropoutKey words
Wind Energy Conversion System (WECS)/Networked Control System (NCS)/Time-delay/Deadband/Package-dropout引用本文复制引用
Zhihong Huo,Zhixue Zhang..Scheduling and control co-design for Networked Wind Energy Conversion Systems[J].全球能源互联网(英文),2019,2(4):328-335,8.基金项目
This work was supported by National Natural Science Foundation of China Research on the Formation Mechanism and Coupled Evolution of Complex Terrain and Wind Turbine Eddy Current,No.U1865101. ()