| 注册
首页|期刊导航|长江科学院院报|河道型水库洪水演进研究进展及存在的问题

河道型水库洪水演进研究进展及存在的问题

芦云峰

长江科学院院报2019,Vol.36Issue(10):122-126,5.
长江科学院院报2019,Vol.36Issue(10):122-126,5.DOI:10. 11988/ckyyb. 20190864

河道型水库洪水演进研究进展及存在的问题

Flood Routing in River-Reservoir System:Research Advances and Existing Problems

芦云峰1

作者信息

  • 1. 长江科学院 空间信息技术应用研究所,武汉 430010
  • 折叠

摘要

Abstract

In the scheduling of river-type reservoir, the impact of inflow flood, artificial regulation, and river basin topography on the flood routing process should be considered. By summarizing the research findings of flood wave features and dynamic reservoir capacity, we made it clear that the scheduling of river-type reservoir should be ac-complished by coupling hydrologic and hydrodynamic models, and meanwhile that attention should be paid to the disturbance of artificial scheduling on the stage-discharge relation at dam site. We summarized that the effect of wa-ter flow structure on riverbed roughness should be taken into consideration in the calculation of reservoir flood rou-ting. Furthermore, we reviewed the research achievements up to now of the flow characteristics near dam and point-ed out that the three-dimensional flow characteristics near dam are remarkable. Taking the cross-section near dam as the boundary condition may cause systematic errors in calculation. In order to improve the accuracy of flood rou-ting model, in future we should conduct in-depth research on the influence of manual regulation on the conveyance capacity of the cross-section near dam and roughness calibration.

关键词

河道型水库/洪水波/动库容/调洪方法/糙率/近坝区水流特性/洪水演进

Key words

river-reservoir system/flood wave/dynamic storage/flood regulation method/roughness/flow charac-teristics near dam/flood routing

分类

建筑与水利

引用本文复制引用

芦云峰..河道型水库洪水演进研究进展及存在的问题[J].长江科学院院报,2019,36(10):122-126,5.

基金项目

国家重点研发计划项目(2017YFC1502601) (2017YFC1502601)

中央级公益性科研院所基本科研业务费项目(CKSF2014033/KJ) (CKSF2014033/KJ)

长江科学院院报

OA北大核心CSCDCSTPCD

1001-5485

访问量1
|
下载量0
段落导航相关论文