煤矿安全2019,Vol.50Issue(10):253-256,4.DOI:10.13347/j.cnki.mkaq.2019.10.058
关停矿井"木矿千坑"转型发展为技术研发实训基地的设计
Design of Technical Research and Training Base Based on Transformation and Development of Closed Mine
赵玉栋 1郭振亮1
作者信息
- 1. 中煤科工集团北京华宇工程有限公司,北京 100120
- 折叠
摘要
Abstract
With the implementation of strategic coal destocking and capacity reduction, coal mine transformation has entered a critical period of development under the "double decrement"mode. In the severe industrial situation, the coal industry is facing new trends and challenges of deep structural adjustment, transformation and upgrading. In order to provide practical reference for the transformation of shut-down mines, this paper introduces the design example of the transformation of Muchengjian Coal Mine into technology research and development training base in Beijing, studies the details and layout of the construction of reuse of mine space, and estimates the investment, so as to provide ideas for the transformation, development and utilization of similar shut-down mines.关键词
木城涧煤矿/煤炭战略/结构调整/井下空间/空间再利用Key words
Muchengjian Coal Mine/coal strategy/structural adjustment/underground space/space reuse分类
矿业与冶金引用本文复制引用
赵玉栋,郭振亮..关停矿井"木矿千坑"转型发展为技术研发实训基地的设计[J].煤矿安全,2019,50(10):253-256,4.