高张紧力气动联网装置设计及试验研究

汪占领 孟宪志 杨志华

煤矿安全2019,Vol.50Issue(11):132-135,4.
煤矿安全2019,Vol.50Issue(11):132-135,4.DOI:10.13347/j.cnki.mkaq.2019.11.032

高张紧力气动联网装置设计及试验研究

Design and Experimental Research of Metal Mesh Pneumatic Tying Device with High Tension

汪占领 1孟宪志 2杨志华1

作者信息

  • 1. 天地科技股份有限公司 开采设计事业部,北京 100013
  • 2. 煤炭科学研究总院 开采设计研究分院,北京100013
  • 折叠

摘要

Abstract

In order to achieve the high pre-tensioned stress and pre-tensioned stress diffusion required by the high pre-tensioned stress bolting system, the high tensioning metal mesh pneumatic tying device was independently researched and developed and the device was mainly composed with the main cylinder assembly, the twisted wire cylinder assembly, the staple mechanism, the push wire mechanism and the twisted wire mechanism. The optimal design parameters of the network U-pin length of 35 mm, wire feed thrust of 2 kN and rotation torque of 6 N·m are analyzed and determined. Experimental results show that high tension pneumatic networking device can provide tension force of about 0.13 kN. The strength of the network is 61.5 % higher than that of artificial network, and it can reach 91.3 % of the strength of the entire network.

关键词

高预应力/气动/联网装置/矿用金属网/人工联网

Key words

high pre-tensioned stress/ pneumatic/ metal mesh tying device/ mine-used metal mesh/ artificial network

分类

矿业与冶金

引用本文复制引用

汪占领,孟宪志,杨志华..高张紧力气动联网装置设计及试验研究[J].煤矿安全,2019,50(11):132-135,4.

基金项目

天地科技股份有限公司科技创新创业资金专项资助项目(2018-TD-ZD007) (2018-TD-ZD007)

中国煤炭科工集团创新创业基金资助项目(2018MS021) (2018MS021)

国家重点研发计划资助项目(2017YFC0603006) (2017YFC0603006)

煤矿安全

OA北大核心CSTPCD

1003-496X

访问量0
|
下载量0
段落导航相关论文