大型组块高位建造重量转移方法与工期研究

傅健 宋青武 王凯华

天然气与石油2019,Vol.37Issue(6):17-21,5.
天然气与石油2019,Vol.37Issue(6):17-21,5.DOI:10.3969/j. issn. 1006-5539.2019.06.003

大型组块高位建造重量转移方法与工期研究

Research on Method and Duration of Large Platform High Position Fabrication Weight Transfer

傅健 1宋青武 1王凯华1

作者信息

  • 1. 海洋石油工程股份有限公司, 天津 300451
  • 折叠

摘要

Abstract

Weight transfer operation is a very critical process in floating topside onshore construction, which takes a connecting link between onshore construction and load-out. The risks and difficulties are relatively high. Whether the weight transfer operation can be completed smoothly and on time is directly related to the topside sailing time. The implementation period of weight transfer is related to the equipment, weather conditions, construction preparation and other factors. This article take the DF 13-2 CEPB topside as an example, research has been conducted on the method and procedures for high position fabrication large topside onshore weight transfer, and on the comparison between the plan and actual duration. At last, a quantitative evaluation method for weight transfer duration has been obtained, which embraces values for promotion.

关键词

重量转移/高位建造/工期/计划/平台支撑框架

Key words

Weight transfer/ High position fabrication/ Duration/ Schedule/ DSF