Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River

Chuanyu Deng 1Fulong Song 2Zhengxi Chen1

作者信息

  • 1. Global Energy Interconnection Development and Cooperation Organization, No. 8 Xuanwumennei Street, Beijing 100031, P.R. China
  • 2. PowerChina Chengdu Engineering Corporation Limited, No. 1 Huanhuabei Street, Chengdu 610072, P.R. China
  • 折叠

摘要

Abstract

There have been few studies on the hydropower exploitation plan for sections beyond the Inga hydropower project (HPP) in the lower reaches of the Congo River. Based on topographic and hydrological data of the basin, the exploitation plan for the lower reaches of the Congo River is herein studied. The preliminary proposal involves exploitation using three-cascade hydropower stations. The Grand Inga HPP is the core of the mega hydropower base. The full supply level (FSL) of the reservoir, installed capacity, and regulation performance of the Grand Inga HPP are studied in detail. The main advantages and disadvantages of the high and low dam schemes of the Grand Inga Hydropower Project are compared, in addition to their effects on the overall development of the hydropower base. Moreover, the installed capacity is optimized based on the load characteristics. Based on simulation of cascade hydropower operation and comprehensive analysis, the project scale and implementation sequence is proposed. The influence of hydropower on socio-economic development, energy supply, and emission reduction is analyzed. Finally, the optimal exploitation scheme of the mega hydropower base for the lower reaches of the Congo River is proposed.

关键词

刚果河/河段开发方案/大英加水电站/巨型水电基地/开发时序

Key words

Congo River/Cascade hydropower exploitation plan/Grand Inga hydropower project/Mega hydropower base/Scheme optimization

引用本文复制引用

Chuanyu Deng,Fulong Song,Zhengxi Chen..刚果河下游巨型水电基地开发规划方案初步研究[J].全球能源互联网(英文),2020,3(1):13-23,11.

基金项目

This work was supported by the State Grid Corporation of China Science and Technology Project (Title: Study on Method and Evaluation Principle for the Cross-Continent Power Transmission Planning). (Title: Study on Method and Evaluation Principle for the Cross-Continent Power Transmission Planning)

全球能源互联网(英文)

OACSCDCSTPCDEI

2096-5117

访问量0
|
下载量0
段落导航相关论文