| 注册
首页|期刊导航|东华大学学报(英文版)|Army-Materiel-System-Analysis-Activity Maturity Projection Model Based on a Subsystem Stein Estimator

Army-Materiel-System-Analysis-Activity Maturity Projection Model Based on a Subsystem Stein Estimator

LI Zhongsheng FAN Jinwei PAN Ri

东华大学学报(英文版)2020,Vol.37Issue(5):436-445,10.
东华大学学报(英文版)2020,Vol.37Issue(5):436-445,10.DOI:10.19884/j.1672-5220.202006041

Army-Materiel-System-Analysis-Activity Maturity Projection Model Based on a Subsystem Stein Estimator

Army-Materiel-System-Analysis-Activity Maturity Projection Model Based on a Subsystem Stein Estimator

LI Zhongsheng 1FAN Jinwei 1PAN Ri1

作者信息

  • 1. Beijing Key Laboratory of Advanced Manufacturing Technology, Beijing University of Technology, Beijing 100124, China
  • 折叠

摘要

关键词

reliability projection/army-materiel-system-analysis-activity maturity projection model ( AMPM )/Stein estimator/subsystem

Key words

reliability projection/army-materiel-system-analysis-activity maturity projection model ( AMPM )/Stein estimator/subsystem

分类

通用工业技术

引用本文复制引用

LI Zhongsheng,FAN Jinwei,PAN Ri..Army-Materiel-System-Analysis-Activity Maturity Projection Model Based on a Subsystem Stein Estimator[J].东华大学学报(英文版),2020,37(5):436-445,10.

基金项目

National Science and Technology Major Project of China(No.2019ZX04006001) (No.2019ZX04006001)

东华大学学报(英文版)

1672-5220

访问量0
|
下载量0
段落导航相关论文