首页|期刊导航|东华大学学报(英文版)|Army-Materiel-System-Analysis-Activity Maturity Projection Model Based on a Subsystem Stein Estimator
东华大学学报(英文版)2020,Vol.37Issue(5):436-445,10.DOI:10.19884/j.1672-5220.202006041
Army-Materiel-System-Analysis-Activity Maturity Projection Model Based on a Subsystem Stein Estimator
Army-Materiel-System-Analysis-Activity Maturity Projection Model Based on a Subsystem Stein Estimator
摘要
关键词
reliability projection/army-materiel-system-analysis-activity maturity projection model ( AMPM )/Stein estimator/subsystemKey words
reliability projection/army-materiel-system-analysis-activity maturity projection model ( AMPM )/Stein estimator/subsystem分类
通用工业技术引用本文复制引用
LI Zhongsheng,FAN Jinwei,PAN Ri..Army-Materiel-System-Analysis-Activity Maturity Projection Model Based on a Subsystem Stein Estimator[J].东华大学学报(英文版),2020,37(5):436-445,10.基金项目
National Science and Technology Major Project of China(No.2019ZX04006001) (No.2019ZX04006001)