气候变化研究进展2020,Vol.16Issue(6):714-724,11.DOI:10.12006/j.issn.1673-1719.2020.061
BCC_CSM1.1m模式对福建前汛期降水预测的误差订正
Verification and preliminary correction of the precipitation prediction in the pre-flood season over Fujian province by BCC_CSM1.1m climate model
摘要
关键词
降水预测/检验/统计订正/BCC_CSM1.1m引用本文复制引用
池艳珍,梁潇云,何芬,吴伟杰,唐振飞..BCC_CSM1.1m模式对福建前汛期降水预测的误差订正[J].气候变化研究进展,2020,16(6):714-724,11.基金项目
国家重点研发计划项目(2018YFC1505805,2016YFA0602100,2018YFE0196000) (2018YFC1505805,2016YFA0602100,2018YFE0196000)
福建省气象局开放式基金(2018K03) (2018K03)