基于模糊隶属度的电力设备资产全寿命周期成本模型及评价体系研究
Life-cycle cost model and evaluation system for power grid assets based on fuzzy membership degree
摘要
Abstract
Life-cycle cost (LCC) theory can be effectively applied to improve the efficiency and quality of power plant equipment and asset management. However, specific aspects of the LCC calculation and evaluation model require further research for practical application. This paper proposes an LCC assessment model for the management of electric power plant equipment during its service life. A membership function method based on fuzzy logic is used to improve the allocation of modernization and overhaul projects to multiple equipment assets. An LCC assessment model and evaluation system for power equipment are proposed and successfully applied to the equipment and project management of a Guangzhou power plant in the China Southern Power Grid, providing a decision-making mechanism that facilitates efficient operation and optimal utilization of power plant equipment and assets.关键词
资产全寿命周期成本/电力设备管理/模糊评价/模糊隶属度/资产分摊Key words
Asset LCC/Power equipment management/Fuzzy evaluation/Membership degree/Asset allocation引用本文复制引用
邹贵林,黄琰,陈雯,吴良峥,文上勇..基于模糊隶属度的电力设备资产全寿命周期成本模型及评价体系研究[J].全球能源互联网(英文),2021,4(4):434-440,7.基金项目
This work was supported by the National Natural Science Foundation of China(U1966210). (U1966210)