Abstract

Life-cycle cost (LCC) theory can be effectively applied to improve the efficiency and quality of power plant equipment and asset management. However, specific aspects of the LCC calculation and evaluation model require further research for practical application. This paper proposes an LCC assessment model for the management of electric power plant equipment during its service life. A membership function method based on fuzzy logic is used to improve the allocation of modernization and overhaul projects to multiple equipment assets. An LCC assessment model and evaluation system for power equipment are proposed and successfully applied to the equipment and project management of a Guangzhou power plant in the China Southern Power Grid, providing a decision-making mechanism that facilitates efficient operation and optimal utilization of power plant equipment and assets.

关键词

资产全寿命周期成本/电力设备管理/模糊评价/模糊隶属度/资产分摊

Key words

Asset LCC/Power equipment management/Fuzzy evaluation/Membership degree/Asset allocation

引用本文复制引用

邹贵林,黄琰,陈雯,吴良峥,文上勇..基于模糊隶属度的电力设备资产全寿命周期成本模型及评价体系研究[J].全球能源互联网(英文),2021,4(4):434-440,7.

基金项目

This work was supported by the National Natural Science Foundation of China(U1966210). (U1966210)

全球能源互联网(英文)

OACSCDCSTPCDEI

2096-5117

访问量0
|
下载量0
段落导航相关论文