首页|期刊导航|地震研究进展(英文)|Simulation of the water level influence on the difference within the water-tube tiltmeter in Shuangyang Lake
地震研究进展(英文)2021,Vol.1Issue(2):33-39,7.
Simulation of the water level influence on the difference within the water-tube tiltmeter in Shuangyang Lake
Simulation of the water level influence on the difference within the water-tube tiltmeter in Shuangyang Lake
摘要
关键词
Water-tube tiltmeter at shuangyang seismostation/Water level of shuangyang lake/Finite element method/Difference of the ground deformationKey words
Water-tube tiltmeter at shuangyang seismostation/Water level of shuangyang lake/Finite element method/Difference of the ground deformation引用本文复制引用
Chong Yue,Chuncheng Tang,Wei Yan,Xiaodong Pan,Xueme Li,Yuwen Tan,Zongfeng Zhang,Tianlong Yu..Simulation of the water level influence on the difference within the water-tube tiltmeter in Shuangyang Lake[J].地震研究进展(英文),2021,1(2):33-39,7.基金项目
This study is sponsored by National Key Research and Development Program of China(2018YFC0807000) (2018YFC0807000)
The Spark Program of Earthquake Technology of CEA(XH20070Y) (XH20070Y)
The Earthquake Tracking Task of CEA(2021010221). (2021010221)