| 注册
首页|期刊导航|铁道工程科学(英文)|An efficient method for train–track–substructure dynamic interaction analysis by implicit-explicit integration and multi-time-step solution

An efficient method for train–track–substructure dynamic interaction analysis by implicit-explicit integration and multi-time-step solution

Lei Xu Wanming Zhai Shengyang Zhu Weizheng Liu

铁道工程科学(英文)2023,Vol.31Issue(1):20-36,17.
铁道工程科学(英文)2023,Vol.31Issue(1):20-36,17.

An efficient method for train–track–substructure dynamic interaction analysis by implicit-explicit integration and multi-time-step solution

An efficient method for train–track–substructure dynamic interaction analysis by implicit-explicit integration and multi-time-step solution

Lei Xu 1Wanming Zhai 2Shengyang Zhu 2Weizheng Liu1

作者信息

  • 1. School of Civil Engineering,Central South University,Changsha 410075,China
  • 2. Train and Track Research Institute,State Key Laboratory of Traction Power,Southwest Jiaotong University,Chengdu 610031,China
  • 折叠

摘要

关键词

Train–track dynamic interaction/Substructure system/Implicit integration/Explicit integration/Multi-time-step solution/Railway engineering

Key words

Train–track dynamic interaction/Substructure system/Implicit integration/Explicit integration/Multi-time-step solution/Railway engineering

引用本文复制引用

Lei Xu,Wanming Zhai,Shengyang Zhu,Weizheng Liu..An efficient method for train–track–substructure dynamic interaction analysis by implicit-explicit integration and multi-time-step solution[J].铁道工程科学(英文),2023,31(1):20-36,17.

基金项目

Appreciation is given to Hubing Liu and Zixu Zhu,the postgraduate students under substantive guidance of Lei Xu,for their work in building and exporting the-ABAQUS?model to be capable of integrating with the self-compiled program in-MATLAB?.This work was supported by the National Natural Science Foundation of China(Grant Nos.52008404,U1934217 and 11790283) (Grant Nos.52008404,U1934217 and 11790283)

Science and Technology Research and Development Program Project of China Railway Group Limited(Major Special Project,No.2020-Special-02) (Major Special Project,No.2020-Special-02)

the National Natural Science Foundation of Hunan Province(Grant No.2021JJ30850). (Grant No.2021JJ30850)

铁道工程科学(英文)

2662-4745

访问量0
|
下载量0
段落导航相关论文