国际设备工程与管理(英文版)2023,Vol.28Issue(1):59-64,6.DOI:10.13434/j.cnki.1007-4546.2023.0105
Finite Element Analysis of Jumbo Rig Assembly for Tunneling
Finite Element Analysis of Jumbo Rig Assembly for Tunneling
YAO Haiping1
作者信息
- 1. Zhangjiakou Xuanhua Huatai Mining&Metallurgical Machinery Co.,Ltd.,Zhangjiakou 075100,China
- 折叠
摘要
关键词
jumbo rig for tunneling/fea/stress/deformation/failure analysisKey words
jumbo rig for tunneling/fea/stress/deformation/failure analysis引用本文复制引用
YAO Haiping..Finite Element Analysis of Jumbo Rig Assembly for Tunneling[J].国际设备工程与管理(英文版),2023,28(1):59-64,6.