中国电机工程学会电力与能源系统学报(英文)2023,Vol.9Issue(3):P.873-883,11.DOI:10.17775/CSEEJPES.2022.01050
Contingency Reserve Evaluation for Fast Frequency Response of Multiple Battery Energy Storage Systems in a Large-scale Power Grid
Indira Alcaide-Godinez 1Feifei Bai 2Tapan Kumar Saha 1Rizah Memisevic3
作者信息
- 1. School of Information Technology and Electrical Engineering,the University of Queensland,Brisbane,QLD 4072,Australia
- 2. School of Information Technology and Electrical Engineering,the University of Queensland(UQ),Brisbane,QLD 4072 School of Engineering and Built Environment,Griffith University,Gold Coast,QLD 4222,Australia
- 3. EPEC Group,Brisbane,QLD 4014,Australia
- 折叠
摘要
关键词
Fast frequency response(FFR)/fast frequency contingency reserve/multiple large-scale battery energy storage system(BESS)/synthetic inertia requirement/under-frequency load shedding(UFLS)分类
信息技术与安全科学引用本文复制引用
Indira Alcaide-Godinez,Feifei Bai,Tapan Kumar Saha,Rizah Memisevic..Contingency Reserve Evaluation for Fast Frequency Response of Multiple Battery Energy Storage Systems in a Large-scale Power Grid[J].中国电机工程学会电力与能源系统学报(英文),2023,9(3):P.873-883,11.