路基工程Issue(5):29-34,6.DOI:10.13379/j.issn.1003-8825.202305031
超长异形深基坑施工对紧邻运营线路水平位移影响分析
Analysis on Influence of Ultra-long Special-shaped Deep Foundation Pit Construction on Horizontal Displacement of Adjacent Operating Lines
胡玉柳1
作者信息
- 1. 福州地铁集团有限公司,福州 350004
- 折叠
摘要
关键词
超长异形基坑/既有隧道水平位移/现场实测弹性地基梁/两阶段法/有限差分法Key words
ultra-long special-shaped foundation pit/horizontal displacement of existing tunnel/elastic foundation beam measured on site/two-stage analysis method/finite difference method分类
建筑与水利引用本文复制引用
胡玉柳..超长异形深基坑施工对紧邻运营线路水平位移影响分析[J].路基工程,2023,(5):29-34,6.