电力建设2023,Vol.44Issue(11):86-94,9.DOI:10.12204/j.issn.1000-7229.2023.11.009
大规模新能源集群接入弱电网的消纳能力评估方法
Evaluation Method of Consumption Ability of New Large Scale Energy Clusters Connected to Weak Grids
摘要
关键词
短路比约束/时序生产模拟/无功补偿/新能源消纳/弱电网系统Key words
short-circuit ratio constraint/time-series production simulation/reactive compensation/new energy accommodation/weak grid system分类
动力与电气工程引用本文复制引用
丁坤,陈博洋,秦建茹,刘永成,杨昌海,刘德祺,孙亚璐,李海波..大规模新能源集群接入弱电网的消纳能力评估方法[J].电力建设,2023,44(11):86-94,9.基金项目
This work is supported by National Natural Science Foundation of China(No. U23B200046) ,Young Elite Scientists Sponsorship Program by CSEE ( No. JLB-2022-97 ) and Sichuan Science and Technology Plan Funding ( No.2023YFSY0032). 国家自然科学基金联合基金项目(U23B200046) (No. U23B200046)
中国电机工程学会青年人才托举工程项目(JLB-2022-97) (JLB-2022-97)
四川省科技计划资助项目(2023YFSY0032) (2023YFSY0032)