中国电力2023,Vol.56Issue(10):62-70,9.DOI:10.11930/j.issn.1004-9649.202307008
考虑损耗的永磁风力发电系统改进功率反馈法最大风能跟踪控制
Improved Maximum Power Point Tracking Control of Power Signal Feedback Method for Permanent Magnet Synchronous Generator Considering Loss
摘要
关键词
风能转换系统/永磁同步发电机/最大功率点跟踪/功率反馈法/爬山搜索法Key words
wind energy conversion system/permanent magnet synchronous generator/maximum power point tracking/power signal feedback method/hill climb searching引用本文复制引用
成云朋,李建华,蔡寿国,张学波,王永,陆晔,朱瑛..考虑损耗的永磁风力发电系统改进功率反馈法最大风能跟踪控制[J].中国电力,2023,56(10):62-70,9.基金项目
国网江苏省电力有限公司科技项目(J2023035) (J2023035)
国家自然科学基金联合基金资助项目(U1966205). This work is supported by Science and Technology Project of State Grid Jiangsu Electric Power Co.,Ltd.(No.J2023035),National Natural Science Foundation of China(No.U1966205). (U1966205)