电力系统保护与控制2023,Vol.51Issue(21):12-21,10.DOI:10.19783/j.cnki.pspc.230190
考虑风光的两阶段配电网动态重构方法
A two-stage dynamic reconfiguration method for distribution networks considering wind and solar power
摘要
关键词
生物地理学算法/整数型环网编码/配电网重构/两阶段优化Key words
biogeography-based optimization/integer ring network coding/distribution network reconfiguration/two-stage optimization引用本文复制引用
杨胡萍,李晓馨,曹正东,李向军,熊宁,徐丕立..考虑风光的两阶段配电网动态重构方法[J].电力系统保护与控制,2023,51(21):12-21,10.基金项目
This work is supported by the National Natural Science Foundation of China(No.61862042). 国家自然科学基金项目资助(61862042) (No.61862042)