煤炭与化工2023,Vol.46Issue(10):86-88,3.DOI:10.19286/j.cnki.cci.2023.10.020
非导水断层的提前加固处理消除滞后出水威胁
Reinforcement treatment of non-water-conducting fault in advance to eliminate the threat of lagging water outflow
苗旺1
作者信息
- 1. 冀中股份公司东庞矿,河北邢台 054000
- 折叠
摘要
关键词
滞后出水/导水断层/注浆加固Key words
lagging water outflow/water conducting fault/grouting reinforcement分类
矿业与冶金引用本文复制引用
苗旺..非导水断层的提前加固处理消除滞后出水威胁[J].煤炭与化工,2023,46(10):86-88,3.