装配式建筑多空间的鲁棒性协同调度研究
Research on robust resource balanced collaborative scheduling of multi space in assembled buildings
摘要
Abstract
With the rapid development of modern industry,assembly construction technology is gradually replacing the traditional construction technology as a new trend in the industry,however,in the actual construction process,uncertainty factors and resource constraints will inevitably interfere with the normal progress of the entire project scheduling plan.Based on this,for the multi-space cooperative scheduling problem under the uncertainties and resource limitations,a mathematical model is constructed with the objectives of schedule,cost and robustness.Based on the difficulty of the multi-space multi-objective model,the model was solved by applying the Matlab software and the fast non-dominated sequential genetic algorithm with the elitist strategy.The scheduling problem of the project of the standard storey of a certain assembly building was taken as an example to find the overall optimal scheduling plan.Taking a standard floor project scheduling problem of an assembly building as an example,the overall optimal scheduling plan was sought,so as to provide decision support for the collaborative scheduling problem of assembly building in multiple spaces.关键词
装配式建筑/多空间/不确定性因素/多目标优化/协同调度/鲁棒性Key words
assembly building/multi-space/uncertainties/multi-objective optimization/co-scheduling/robustness分类
建筑与水利引用本文复制引用
汪和平,朱睿芳..装配式建筑多空间的鲁棒性协同调度研究[J].哈尔滨商业大学学报(自然科学版),2023,39(6):742-751,10.基金项目
国家自然科学基金(72274001) (72274001)
安徽省高校人文社科重大项目(SK2021ZD0035) (SK2021ZD0035)
复杂系统多学科管理与控制安徽省教育厅重点实验室开放课题(RZ2200000691) (RZ2200000691)