净水技术2023,Vol.42Issue(z2):80-85,6.DOI:10.15890/j.cnki.jsjs.2023.s2.014
污水处理厂染整废水与生活污水分置混合处理工程实例
Engineering Example of Mixed Treatment Project of Dyeing and Finishing Wastewater and Domestic Wastewater in WWTP
陈洪贵1
作者信息
- 1. 雅安沃克林环保科技有限公司,四川雅安 625000
- 折叠
摘要
Abstract
The influent from a wastewater treatment plant(WWTP)in an industrial new district of Shandong is mainly textile dyeing and finishing industrial wastewater and domestic wastewater.The main process route is"industrial wastewater pretreatment process+domestic wastewater pretreatment process+mixed wastewater treatment process".Industrial wastewater pretreatment process adopts"anaerobic tank+hypoxia tank+aeration regulation tank+aerobic tank+primary sedimentation tank+ozone advanced oxidation tank"treatment,and domestic wastewater pretreatment process adopts"coarse grid+lifting pump station+fine grid+sedimentation tank"treatment.After the textile dyeing and finishing industrial wastewater is treated to the A level criteria of Wastewater Quality Standards for Discharge to Municipal Sewers(GB/T 31962-2015),it is then mixed with domestic wastewater for treatment.The mixed wastewater(industrial+domestic)treatment process adopts"anaerobic+hypoxia+two-stage AO+MBR+ozone contact oxidation+disinfection contact tank"for continuous operation for 12 months.The actual data prove that the treated effluent water quality can reach first A criteria in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant(GB/T 18918-2002),and it is discharged into the Chaiwen River.关键词
工业新区/污水处理厂/染整废水/生活污水/混合污水Key words
industrial new area/wastewater treatment plant(WWTP)/dyeing and finishing wastewater/domestic wastewater/mixed wastewater分类
建筑与水利引用本文复制引用
陈洪贵..污水处理厂染整废水与生活污水分置混合处理工程实例[J].净水技术,2023,42(z2):80-85,6.