基于连续-非连续分析理论的隧道围岩破坏区判识方法研究

肖明清 徐晨 杨剑 吴佳明 付晓东 周永强

岩土力学2023,Vol.44Issue(11):3099-3108,10.
岩土力学2023,Vol.44Issue(11):3099-3108,10.DOI:10.16285/j.rsm.2023.0652

基于连续-非连续分析理论的隧道围岩破坏区判识方法研究

Study on the identification method of tunnel surrounding rock failure zone based on continuous discontinuous analysis theory

肖明清 1徐晨 1杨剑 1吴佳明 1付晓东 2周永强2

作者信息

  • 1. 中铁第四勘察设计院集团有限公司,湖北武汉 430063||水下隧道技术国家地方联合工程研究中心,湖北武汉 430063
  • 2. 中国科学院武汉岩土力学研究所岩土力学与工程国家重点实验室,湖北武汉 430071
  • 折叠

摘要

Abstract

Accurate analyzing the scope of tunnel excavation failure zone has important guidance and engineering significance in determining support parameters reasonably.This study focuses on the identification methods of tunnel surrounding rock failure zone,specifically the continuous medium analysis method and the continuous-discontinuous method represented by the finite element-discrete element coupling method(FDEM).Firstly,the continuous medium analysis method and FDEM identification criteria for surrounding rock failure are studied.Then the rock mass is divided into elastic rock elements and elastic-plastic interface elements.Based on the concept of equivalent continuous model,the relationship between the mechanical parameters of interface elements and rock elements and rock mass element is mathematically derived.The connection between the parameter values of these two methods is established for the first time,resolving the challenge of determining values in the continuous-discontinuous method.Finally,the ranges of surrounding rock failure zones simulated by these two methods during the excavation process of railway tunnels with different lithology and cross-sections are compared.According to the range of mechanical parameters for each level of surrounding rock mass in the specification,the range of values for the main failure parameters of surrounding rock,such as penalty parameter and fracture energy,in FDEM,is given for each level of surrounding rock.The simulation results of railway tunnel excavation with different lithology and cross sections using the continuous medium method represented by FLAC3D and FDEM method show that the plastic zone obtained by the continuous medium method,and the failure zone obtained by the plastic limit strain,as well as the crack growth zone and failure zone obtained by the continuous-discontinuous method,are generally consistent in terms of distribution range,shape and failure mode.The method proposed in this article for determining the failure parameters of surrounding rock in FDEM is verified as reasonable and feasible.

关键词

连续-非连续分析方法/FDEM/隧道/破坏区识别/参数取值/连续介质分析方法

Key words

continuous-discontinuous method/FDEM/tunnel/identification of failure zone/parameter values/continuous medium analysis method

分类

土木建筑

引用本文复制引用

肖明清,徐晨,杨剑,吴佳明,付晓东,周永强..基于连续-非连续分析理论的隧道围岩破坏区判识方法研究[J].岩土力学,2023,44(11):3099-3108,10.

基金项目

国家重点研发计划(No.2021YFB2600400).This work was supported by the National Key Research and Development Program(2021YFB2600400). (No.2021YFB2600400)

岩土力学

OACSCD

1000-7598

访问量0
|
下载量0
段落导航相关论文