| 注册
首页|期刊导航|电力勘测设计|抽水蓄能电站高水头偏心铰弧形闸门安装技术

抽水蓄能电站高水头偏心铰弧形闸门安装技术

齐界夷 程雪如

电力勘测设计Issue(12):87-92,6.
电力勘测设计Issue(12):87-92,6.DOI:10.13500/j.dlkcsj.issn1671-9913.2023.12.016

抽水蓄能电站高水头偏心铰弧形闸门安装技术

Installation Technology of High Water-Head Eccentric Hinge Arc Gate for Pumped Storage Power Station

齐界夷 1程雪如2

作者信息

  • 1. 中国葛洲坝集团三峡建设工程有限公司,湖北 宜昌 443002||中国能建工程研究院水电施工设计研究所,湖北 宜昌 443002
  • 2. 长江生态环保集团有限公司,湖北 武汉 430010
  • 折叠

摘要

Abstract

The high water-head eccentric hinge arc gate has the characteristics of complex structure,high installation accuracy,many processes,and large cross-operation interference.Compared with conventional gates,it is more difficult to construct and has high safety risks.This paper summarizes the innovative installation technology of the eccentric hinged arc gate at the outlet of the reservoir under Changlongshan pumped storage power station to provide reference for similar projects.

关键词

抽水蓄能电站/高水头/偏心铰弧门

Key words

pumped storage power station/high water-head/eccentric hinge arc gate

分类

建筑与水利

引用本文复制引用

齐界夷,程雪如..抽水蓄能电站高水头偏心铰弧形闸门安装技术[J].电力勘测设计,2023,(12):87-92,6.

电力勘测设计

1671-9913

访问量0
|
下载量0
段落导航相关论文